RESPONSIBLE AGENCY NULP (National University "Lviv Polytechnic")
RESPONSIBLE FOR METADATA NULP (National University "Lviv Polytechnic")
CURRENT STATION CONFIGURATION ter200ukr_20230413.log
STATUS IN EPN included since 09-01-2022
DATA LICENSE CC-BY-4.0
LAST AVAILABLE DATA 28-11-2024
LAST RECEIVER TRIMBLE NETR9 (23-07-2021 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+SBAS
LAST ANTENNA TRM55971.00/NONE (23-07-2021 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY BEV, BKG, GFZ, UPA

The RINEX 2 data are no more submitted to the EPN data centres since 20-09-2021.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 212/2021 N/A
BEV 212/2021 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS+QZSS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 326/2024 78.57%
BEV 333/2024 92.86%
BKGE 332/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 333/2024 (D) 96.43% 95.24%
BKGE 333/2024 (D) 96.43% 95.24%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page

BKG upload settings to other data centres.

Location

Pictures